5950--NRM-CONST 528A5-24-516 - Replace 5MV Transformer 36C24225B0028

Solicitation 36C24225B0028 Copied Notice ID 448a215d41af440fa5fd919caa063345 Copied VETERANS AFFAIRS, DEPARTMENT OF — 242-NETWORK CONTRACT OFFICE 02 (36C242)
SAM.gov
Posted
Jun 18, 2025
Deadline
Jul 16, 2025
Set-aside
None
NAICS
238210
PSC
5950

Summary

AI-generated · Aug 23, 2025

Replace the campus’s primary 5 MVA transformer by removing the damaged unit and installing a new in-kind transformer, with crane support for lifting, followed by connection and testing. All electrical work must meet NEC, VA standards, and manufacturer requirements, performed only by certified personnel, and the contractor must manage abatement in accordance with NYSCR 56. The work must minimize disruption to patients, maintain site cleanliness, and be completed under a defined submittal process (an Excel submittal log; no on-site work until submittals are approved with a minimum COR review of 14 days). Deliverables include a Transformer Lift Plan; the VA will take possession of the old transformer, and a 1-year warranty covering labor and parts is required. The project is planned to span three years, with potential off-tour work to reduce patient impact.

New information includes that acceptance testing must be performed by NETA-certified technicians, the transformer is currently out of service and will require de-energization before work begins, and downtime is limited to about one week. The replacement should be a direct replacement or approved equal, mounted on the existing concrete pad with existing anchors, and the new transformer may be set inside the secure yard area without impeding access. Lockout locations are in the adjacent switchgear, MV cable terminations do not require testing unless damaged, and spare parts must be provided. References to current drawings are attachments, and Bath, NY is not part of this project.

Replace 5MV Transformer 528A5-24-516 GENERAL PROJECT WORK SCOPE DESCRIPTION Existing Conditions: The Canandaigua VAMC is located at 400 Fort Hill Avenue, Canandaigua, NY 14424. The layout is a campus with more than 30 buildings located on over 150 acres. Normal working hours are Monday Friday 8:00am 4:30pm. The electric service for the campus enters at the northwest corner of the property through a 5 MVA transformer, with a redundant backup. One transformer was recently damaged from pest activity and subsequently repaired, however this is not a long term fix and it needs to be replaced. Scope of Work: Contractor is to provide all labor, material, equipment, supervision, to replace the primary 5 MVA transformer in kind. Work shall include disconnect and removal of the existing transformer, installation of a new transformer, connection and testing. Contractor to provide a crane service for removal and installation of equipment. Existing transformer to be turned over to VA. All Electrical work to be in compliance with NEC and equipment manufacturer standards. Code requirements: The repaired equipment must, at a minimum, be in accordance with all applicable codes including Veterans Affairs standards which can be found at https://www.cfm.va.gov/til/. This will include, but not be limited to: Department of Veterans Affairs Design Manuals, VA Publications, and Construction Standards, National Fire Protection Code (NFPA), Life Safety Code, Underwriters Laboratory (UL), International Building Code IBC, National Electric Code (NEC), the VA Information Security Handbook 6500.6, Occupational Health and Safety (OSHA), and Environmental Protection Agency (EPA) requirements (to include Mold Remediation in Schools and Commercial Buildings). All work will be completed by certified individuals. All abatement will be in compliance with NYSCR 56. Specifications: Project Location Map Cut-sheet of existing transformer Transformer Specifications General Requirements: The contractor shall repair equipment to original functionality. Where conflicts exist work shall not proceed until the COR has been notified and has given direction. Prior to any work commencing in an area, the contractor shall notify the COR of his intention to work in the area and shall schedule a walkthrough with the COR to determine existing conditions. After the work, the existing work areas shall be returned to their original state before final approval shall be given. After the completion of construction, the contractor shall completely clean all surfaces of construction debris. The contractor shall receive all deliveries of materials, equipment, tools, or other goods off station, and bring them to the job site. The Canandaigua VA shall not accept deliveries for project purposes. The contractor shall prepare and submit an excel spreadsheet listing all submittals required. The worksheet shall be submitted by the contractor and reviewed and re-submitted as necessary. The contractor shall not proceed with any on-site work until the completion of the submittal process or approval to proceed from the CO and COR without completion of the submittal process. Not less than 14 calendar days shall be planned for COR review of each submittal. Re- submittals shall be provided as required by the COR, and shall be treated as a new, separate submittal. Any non-lead time materials will only be paid for when installed. Any items identified as punch list items will be fixed prior to project closeout. Special care will be taken to secure tools and construction equipment during construction as this facility has patients in it. Work cleanliness must be adhered to throughout the project. Sounds and vibrations must be kept to a minimum to avoid patient disruption. The COR reserves the right to stop work if sound and vibrations are impacting patient living or employees. Off tour work may be required to minimize impact to Veterans and employees. The contractor shall warranty all work including for 1 year from the date of acceptance. Warranty shall include any labor or parts necessary to ensure complete functionality of the repaired equipment. Submittals: The following shall be submitted to the COR for approval prior to construction: Transformer Lift Plan Project Duration: The project duration is 3 years.

From Solicitation posted on Jun 18, 2025

Does the acceptance testing of the new transformer need to be completed by NETA certified technicians? Yes Is the transformer to be replaced currently de-energized and only being used for backup? The transformer is currently out of service pending repairs scheduled to be completed during Summer 2025. The bidding contractors shall assume the transformer will need to be de-energized prior to work start. Is there a preferred day of the week and time of day for the transformer replacement? There is no preference, coordination with facilities will be required to minimize impact. What is the maximum duration for the redundant transformer to be unavailable during replacement? 1 week maximum. Please provide specific details on how the existing transformer being replaced will be turned over. (set to the side of the yard or transported to a designated location?) The transformer can be set to the side within the secure fence in a location to not impede access to other equipment. Does the facility have one-line drawings, as-builts, or design drawings of any kind for the current primary switchgear, transformer, and secondary switchgear? Refer to Attachment B _ ES107 _ Electrical Site Plan This attachment is from the original design at time of award. Actual installation of the transformer may vary slightly. Does the facility know the correct lockout locations to isolate the transformer being replaced? Lockout locations are in the adjacent switchgear within the secure fence area. Please confirm no testing or new terminations are required for the existing MV cables. Testing of new terminations is not required as the existing terminations are to be re-used. Testing may be required if the existing terminations are damaged during construction and need to be replaced. Do you have pictures of the Medium Voltage and Low Voltage connection compartments. Just would like to see the conduit arrangement and the connections. Refer to Attachment A _ Pictures Are transformers in the basis of design memo what was originally purchased? Yes Is the VA looking for a direct replacement of the failed one? Yes. Approved equal would be considered. Is the VA looking for a direct replacement of the failed one? Yes. Approved equal would be considered. If Yes then in the specifications that were sent out the installation instructions 3.1.A, B, C, D.1,.2, .3 would have already been done by the initial installer of the transformer Concrete pad, anchors, and grounding rods are all existing. The new transformer shall be mounted to the existing concrete pad using existing anchors to secure the unit. Contractor is responsible for any additional anchors that may be required to for proper installation. 3.4 - Spare parts are they required as part of this bid? Yes 3.5 - Instruction - is this still required? Not Needed Q13. A previous notice described a transformer in Bath, NY as well? Is this a part of this project? The Bath transformer was able to be replaced in-house and is not a part of this project.

From Solicitation posted on Jul 11, 2025

VHA Regional Procurement Office-East NETWORK CONTRACTING OFFICE 2 Albany-Stratton/Bath/Bronx/Canandaigua/Northport/Syracuse Medical Centers Hudson Valley/New Jersey/New York Harbor Healthcare Systems WNY Upstate New York Healthcare System September 12, 2025 Reference: 36C24225B0028, Replace 5MV Transformer Dear Contractor: Thank you for your bid submitted in response to the above referenced solicitation. Although your offer was deemed acceptable, we regret to inform you were not the low bidder and not selected for award. Number of bids received: (5) Contract was awarded to: DC SERVICES CNY, LLC 601 CHURCH ST SOLVAY, NY 13209 Contract Price: $419,263.00 Items awarded: Line Item 0001 (Base Bid) We sincerely appreciate your interest and look forward to the possibility of working with you on future opportunities. Sincerely, Devan Bertch Contracting Specialist

From Award Notice posted on Sep 18, 2025

Notice history

3
  1. Solicitation Posted Jun 18, 2025
  2. Solicitation Posted Jul 11, 2025
    • Description: Description was updated
    • Response Deadline: Jul 16, 2025Jul 23, 2025
  3. Award Notice LATEST Posted Sep 18, 2025

Details

Solicitation number 36C24225B0028
Notice ID 448a215d41af440fa5fd919caa063345
Award number 36C24225C0093
Notice type Solicitation
Product / Service (PSC) 5950
NAICS 238210
Archive date Sep 14, 2025

Award Information

Awardee
1
Total Awarded
$419,263.00
Award Date
Sep 18, 2025

Award Notices

Y1DA--528A5-24-516 - Replace 5MV Transformer View Notice

Posted: Sep 18, 2025

VHA Regional Procurement Office-East NETWORK CONTRACTING OFFICE 2 Albany-Stratton/Bath/Bronx/Canandaigua/Northport/Syracuse Medical Centers Hudson Valley/New Jersey/New York Harbor Healthcare Systems WNY Upstate New York Healthcare System September 12, 2025 Reference: 36C24225B0028, Replace 5MV Tran...

Awardees

Company Name UEI CAGE Code Location
DC SERVICES CNY, LLC CB83QN7DK6H5 08N90 SOLVAY

Contacts

primary
Devan Bertch

Contract Specialist

Email

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
242-NETWORK CONTRACT OFFICE 02 (36C242)

Place of Performance

Dates

Posted Jun 18, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 16, 2025 1 year ago