50-60-Ton Rough Terrain Crane Rental W912ES25QA030

Solicitation W912ES25QA030 Copied Notice ID 9d7794619b004d34bd73f371ca0e7928 Copied DEPT OF DEFENSE — W07V ENDIST ST PAUL
SAM.gov
Posted
Jul 07, 2025
Deadline
Jul 18, 2025
Set-aside
SBA
NAICS
532412
PSC
W038

Summary

AI-generated · Aug 25, 2025

Rent a 50–60-ton rough-terrain hydraulic crane for the Orwell Dam dewatering work. The crane must provide at least 50 tons and up to 60 tons of capacity, with a minimum boom length of 100 feet; a jib is not required but acceptable. It must lift 10,500 lbs at a 60-foot radius with outriggers extended to the maximum 23-foot reach. Delivery is required by the project timeline, with two one-week option periods in late September to mid-October 2025; deliveries and pickups must occur 8:00 AM–3:00 PM, and no deliveries on holidays or weekends. The contract is for crane rental only, with USACE personnel operating the crane and no rigging required; upon delivery, the crane will be inspected jointly by USACE and the contractor before it is in USACE possession.

Provide a weekly rental rate that includes transportation to and from the job site, and quote two one-week option periods. Include any routine maintenance during the rental, and ensure a service technician is available within three hours of a breakdown. The crane must be inspected by a qualified person per EM 385-1-1, with a certificate of compliance, a copy of the annual crane inspection, a daily operational checklist, and any required machine-specific training. Deliver/pickup at the USACE Orwell Dam site in Fergus Falls, MN. All options will be evaluated on price and exercised only if needed. The three notices are identical in scope; no changes between them.

Scope of Work for 50-to-60-ton Rough Terrain Crane for Orwell Dam Dewatering The purpose of this contract is to provide a minimum of 50-ton and maximum of 60-ton Rough Terrain Hydraulic Crane. The crane shall have a minimum Boom Length of 100 ; Jib would not be needed but is acceptable. The crane shall be capable of lifting 10,500 lbs. (after all deductions) at a radius of 60 with outriggers fully extended to maximum distance of 23 center of beam cylinders. Delivery date of the crane shall be on or before 25 August 2025 and tentative pickup date 29 September 2025 with two (2) one (1) week options. The first option week will begin on 9/29/2025 and end on 10/6/2025. The second option week will begin on 10/6/2025 and end on 10/13/2025. Hours for delivery and pick-up must be between 8:00 AM and 3:00 PM. No deliveries will be received on holidays or weekends. A service technician shall be available within three hours of notification of a breakdown or malfunction. The Crane shall be inspected by a qualified person in accordance with EM 385-1-1 which is the U.S. Army Corps of Engineers Safety Manual. This is available at the USACE Web Site: https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf A certificate of compliance shall be provided to USACE by the equipment rental company, a copy of the annual crane inspection, daily operational checklist and any brief machine specific training for the operation of the crane. In addition, upon delivery of the crane, the crane shall be inspected with USACE personnel and contractor to verify the condition of the crane before it is in the possession of USACE. Crane rental only, USACE employees will operate crane. Rigging is not required. The Contractor shall quote a weekly rate for the Crane and include the cost for transportation of the crane to and from the job site. Contractor shall also quote on two (2) one (1) week options. Any routine maintenance that would need to be performed during the rental period should also be included in the rental rate. All options will be evaluated based on price and only exercised if needed. The Crane shall be delivered and picked up at the site of the dewatering to include unloading and loading: USACE Orwell Dam 14780 Orwell Road Fergus Falls, MN 56537

From Combined Synopsis/Solicitation posted on Jun 26, 2025

Scope of Work for 50-to-60-ton Rough Terrain Crane for Orwell Dam Dewatering The purpose of this contract is to provide a minimum of 50-ton and maximum of 60-ton Rough Terrain Hydraulic Crane. The crane shall have a minimum Boom Length of 100 ; Jib would not be needed but is acceptable. The crane shall be capable of lifting 10,500 lbs. (after all deductions) at a radius of 60 with outriggers fully extended to maximum distance of 23 center of beam cylinders. Delivery date of the crane shall be on or before 25 August 2025 and tentative pickup date 29 September 2025 with two (2) one (1) week options. The first option week will begin on 9/29/2025 and end on 10/6/2025. The second option week will begin on 10/6/2025 and end on 10/13/2025. Hours for delivery and pick-up must be between 8:00 AM and 3:00 PM. No deliveries will be received on holidays or weekends. A service technician shall be available within three hours of notification of a breakdown or malfunction. The Crane shall be inspected by a qualified person in accordance with EM 385-1-1 which is the U.S. Army Corps of Engineers Safety Manual. This is available at the USACE Web Site: https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf A certificate of compliance shall be provided to USACE by the equipment rental company, a copy of the annual crane inspection, daily operational checklist and any brief machine specific training for the operation of the crane. In addition, upon delivery of the crane, the crane shall be inspected with USACE personnel and contractor to verify the condition of the crane before it is in the possession of USACE. Crane rental only, USACE employees will operate crane. Rigging is not required. The Contractor shall quote a weekly rate for the Crane and include the cost for transportation of the crane to and from the job site. Contractor shall also quote on two (2) one (1) week options. Any routine maintenance that would need to be performed during the rental period should also be included in the rental rate. All options will be evaluated based on price and only exercised if needed. The Crane shall be delivered and picked up at the site of the dewatering to include unloading and loading: USACE Orwell Dam 14780 Orwell Road Fergus Falls, MN 56537

From Combined Synopsis/Solicitation posted on Jun 30, 2025

Scope of Work for 50-to-60-ton Rough Terrain Crane for Orwell Dam Dewatering The purpose of this contract is to provide a minimum of 50-ton and maximum of 60-ton Rough Terrain Hydraulic Crane. The crane shall have a minimum Boom Length of 100 ; Jib would not be needed but is acceptable. The crane shall be capable of lifting 10,500 lbs. (after all deductions) at a radius of 60 with outriggers fully extended to maximum distance of 23 center of beam cylinders. Delivery date of the crane shall be on or before 25 August 2025 and tentative pickup date 29 September 2025 with two (2) one (1) week options. The first option week will begin on 9/29/2025 and end on 10/6/2025. The second option week will begin on 10/6/2025 and end on 10/13/2025. Hours for delivery and pick-up must be between 8:00 AM and 3:00 PM. No deliveries will be received on holidays or weekends. A service technician shall be available within three hours of notification of a breakdown or malfunction. The Crane shall be inspected by a qualified person in accordance with EM 385-1-1 which is the U.S. Army Corps of Engineers Safety Manual. This is available at the USACE Web Site: https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf A certificate of compliance shall be provided to USACE by the equipment rental company, a copy of the annual crane inspection, daily operational checklist and any brief machine specific training for the operation of the crane. In addition, upon delivery of the crane, the crane shall be inspected with USACE personnel and contractor to verify the condition of the crane before it is in the possession of USACE. Crane rental only, USACE employees will operate crane. Rigging is not required. The Contractor shall quote a weekly rate for the Crane and include the cost for transportation of the crane to and from the job site. Contractor shall also quote on two (2) one (1) week options. Any routine maintenance that would need to be performed during the rental period should also be included in the rental rate. All options will be evaluated based on price and only exercised if needed. The Crane shall be delivered and picked up at the site of the dewatering to include unloading and loading: USACE Orwell Dam 14780 Orwell Road Fergus Falls, MN 56537

From Combined Synopsis/Solicitation posted on Jul 07, 2025

Notice history

3
  1. Combined Synopsis/Solicitation Posted Jun 26, 2025 View
  2. Combined Synopsis/Solicitation Posted Jun 30, 2025
    No changes from previous notice
  3. Combined Synopsis/Solicitation LATEST Posted Jul 07, 2025
    No changes from previous notice

Details

Solicitation number W912ES25QA030
Notice ID 9d7794619b004d34bd73f371ca0e7928
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) W038
NAICS 532412
Place of performance Fergus Falls, Minnesota
Archive date Aug 02, 2025

Award Information

Not yet awarded

Contacts

primary
Karl Just

Email

Phone

secondary
Kevin P. Henricks

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION MISSISSIPPI VALLEY
W07V ENDIST ST PAUL

Place of Performance

Fergus Falls, Minnesota 56537
USA

Dates

Posted Jul 07, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 18, 2025 1 year ago