48 OSS ATC Flightline Radio Upgrade F3YCFA5071AC03
Summary
AI-generated · Aug 29, 2025Procure and install telecommunications infrastructure hardware, fiber-optic transport platforms, and ATC radio interface modules to replace legacy, end-of-life copper-based connectivity that currently supports critical ATC navigational aids (NavAids) and RAPCON communications at RAF Lakenheath.
Project scope includes provisioning and on-site installation/integration of the new hardware per the attached Statement of Objectives and Equipment List, with a Brand Name Justification attachment (redacted) and a Quote Sheet outlining pricing.
This acquisition is for the 48 OSS Air Traffic Control (ATC) Flightline Radio Upgrade at RAF Lakenheath. The requirement provides for the procurement and installation of telecommunications infrastructure hardware, fiber-optic transport platforms, and associated ATC radio interface modules necessary to replace legacy, end-of-life (EoL) copper-based connectivity systems currently supporting critical ATC navigational aids (NavAids) and RAPCON communications. Please see attached: Soliciation Document FA558725Q0075 Attachment 0001 Statement of Objectives Attachment 0002 Equipment List Attachment 0003 Quote Sheet Attachment 0004 Brand Name Justification (Redacted)
From Combined Synopsis/Solicitation posted on Aug 28, 2025This acquisition is for the 48 OSS Air Traffic Control (ATC) Flightline Radio Upgrade at RAF Lakenheath. The requirement provides for the procurement and installation of telecommunications infrastructure hardware, fiber-optic transport platforms, and associated ATC radio interface modules necessary to replace legacy, end-of-life (EoL) copper-based connectivity systems currently supporting critical ATC navigational aids (NavAids) and RAPCON communications. Please see attached: Soliciation Document FA558725Q0075 Solicitation Amendment - FA558725Q00750001 Attachment 0001 Statement of Objectives Attachment 0002 Equipment List Attachment 0003 Quote Sheet Attachment 0004 Brand Name Justification (Redacted)
From Combined Synopsis/Solicitation posted on Sep 11, 2025Notice history
2-
Combined Synopsis/Solicitation Posted Aug 28, 2025
-
Combined Synopsis/Solicitation LATEST Posted Sep 11, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 12, 2025 → Sep 19, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
GBR