AI-generated · Aug 26, 2025Provide and install 8-inch CPVC pipe and fittings to connect the existing parts washer exhaust pipe to the outdoors. Extend the existing pipe vertically about 14 feet, then run a horizontal section about 28 feet to exit the building above the hangar doors on the north side of hangar 11. The horizontal run must be supported from the concrete ceiling as required (the ceiling is roughly 3 feet above the pipe). The vent exit area is corrugated steel and must be cut to allow the exhaust pipe to pass through, with sealing around the pipe once installed. Install a barrier to prevent birds and other rodents from entering.
Market research is being conducted via a sources sought notice and this is not a solicitation; it does not obligate the government. Responding will not authorize work or reimburse costs; any actual work requires a contract signed by a warranted Contracting Officer. See attached statement of work and photos for additional information.
Provide and install 8" CPVC pipe and fittings from the existing parts washer exhaust pipe to outside the building. The existing 8 CVPC pipe will need to be extended and supported vertically approximately 14 feet. Then the pipe will need to run horizontally approximately 28 feet and exit building above the hangar doors on the north side of hangar 11. The horizontal pipe will need to be supported from the concrete ceiling as required. The ceiling is approximately 3 feet above where the horizontal pipe will run. The area that the vent will exit the building is corrugated steel and will need to be cut to allow for the exhaust pipe to exit the hangar. This area will need to be sealed around the exhaust pipe once installed. The exhaust pipe will also require some type of barrier to prevent birds and other rodents from entering. -See attached statement of work and photos for more information. ***This sources sought is for market research only and does not obligate the Government. It is not a solicitation and cannot be accepted to form a contract. The Government will not reimburse costs for responding, and no work is authorized without a contract signed by a warranted Contracting Officer.***
From Sources Sought posted on Aug 22, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA