435th Stripe Hog Parts FA561326Q0015
Summary
AI-generated · Mar 12, 2026The 435th Construction and Training Squadron requires the acquisition of maintenance parts, including shipping, for an existing high-pressure pump system. The package includes replacement heads and specialized spare parts/tools for the pump system and for the heads.
The parts are needed to maintain the already acquired system and to provide mobile maintenance capability. See attached specs.
The 435th Construction and Training Squadron requires the acquisition of maintenance parts including shipping. The request includes replacement heads, specialized spare parts/tools for the high pressure pump system, and specialized spare parts/tools for the heads. These parts are necessary for the upkeep of an already acquired system, as well as provide mobile maintenance abilities. See attached specs
From Solicitation posted on Mar 11, 2026The 435th Construction and Training Squadron requires the acquisition of maintenance parts including shipping. The request includes replacement heads, specialized spare parts/tools for the high pressure pump system, and specialized spare parts/tools for the heads. These parts are necessary for the upkeep of an already acquired system, as well as provide mobile maintenance abilities. See attached specs
From Solicitation posted on Apr 01, 2026Notice history
2-
Solicitation Posted Mar 11, 2026
-
Solicitation LATEST Posted Apr 01, 2026View changes (1)
- Response Deadline: Apr 20, 2026 → Apr 08, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
DEU