Contacts, documents and full notice history are available with a subscription.
Award Notice 2 notices

42 Fire Hose Nozzle SPE8E926Q0001

Solicitation SPE8E926Q0001 Copied Notice ID 6279a36c5d2c452aa19aaffd3e87e615 Copied DEPT OF DEFENSE — DLA TROOP SUPPORT
SAM.gov
Posted
Oct 02, 2025
Deadline
Oct 17, 2025
Set-aside
None
NAICS
N/A
PSC
4210

Summary

AI-generated · Oct 08, 2025

Acquire one fire nozzle (NSN 4210-00-465-1906) through an unrestricted RFQ (SPE8E9-26-Q-0001). The nozzle must be manufactured to MIL-N-24408E(SH) with the referenced drawings and QAPs, and it includes a First Article Testing (FAT) requirement. Four samples must undergo FAT, with a FAT report due 120 days after award; submit the FAT report and all FAT results (including DD1222) to the designated DLA mailbox (CE_TESTING@DLA.MIL). Government review of FAT results will occur within 90 days of receipt. Two FAT samples must be retained by the contracting officer or designee until contract completion, and FAT samples must be permanently stamped with a government logo and the FAT completion date. Source inspection is required.

The contract is a indefinite-delivery type with an estimated annual quantity of about 2,300 each, two base years and three 1-year options. Delivery is anticipated in 90 days, FOB Origin with inspection/acceptance at origin. Pricing must cover base years and all options; option pricing will be used in place of an Economic Price Adjustment. The RFQ will be posted on SAM.gov (no hard copies; PDFs available) and is 30 days in duration.

DLA Troop Support intends to issue an unrestricted Request for Quote (RFQ) for the acquisition of one NSN, 4210-00-465-1906 (Fire Equipment Nozzle), under solicitation number SPE8E9-26-Q-0001. This item is manufactured to the following: IAW BASIC SPEC NR MIL-N-24408E(1) NOT 1 REVISION NR 1 DTD 06/05/2024 PART PIECE NUMBER: P/N M24408-T1-1 IAW REFERENCE DRAWING NR 80064 4444647 REVISION NR DTD 12/13/1971 PART PIECE NUMBER: IAW REFERENCE QAP 13873 QAP-EQ003 REVISION NR D DTD 02/09/2023 PART PIECE NUMBER: IAW REFERENCE QAP 14153 SQAP-FAT3 REVISION NR DTD 06/15/2022 PART PIECE NUMBER: TEST REQUIREMENTS First Article Test (FAT). Contractor Testing Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified in MIL-N-24408E(SH) Four samples shall be subjected to the first article inspection. Submission of test report due 120 days after the award of the contract. First article test report. A first article test report shall be prepared and be provided to the Contracting Officer for approval/disapproval In Addition - SUBMIT ALL FIRST ARTICLE TEST RESULTS, TO INCLUDE FORM DD1222, TO THE CONSTRUCTION AND EQUIPMENT FAT MONITOR AT CE_TESTING@DLA.MIL. Government review will be within 90 days of receiving FAT report. The First Article Samples that are identified as acceptable. After completion of first article testing, two nozzles from the samples subjected to the first article test shall be turned over to the contracting officer or designee for retention until completion of the contract. First article samples shall be permanently marked (i.e. steel stamped) with a government logo, along with the date that the first article testing was completed. SOURCE INSPECTION REQUIRED. The solicitation period will be 30 days; the Request for Quote (RFQ) will be posted on SAM.gov AFTER October 14, 2025. It will be for an indefinite delivery contract with an annual estimated quantity of 2300 EA with 2 base years and 3, one-year option periods. Option pricing will be utilized in leu of an Economic Pricing Adjustment. The anticipated required delivery schedule is 90 days. Delivery will be FOB Origin, Inspection / Acceptance at Origin. Pricing should be provided for both the base years and each of the 3 one year options. All proposals must include a copy of a completed solicitation. Follow directions as outlined in the solicitation when posted. NOTE: Copies of the solicitation package will not become available until the solicitation issue date; copies will be made available on SAM at https://www.SAM.gov. From the DIBBS Homepage select RFP/IFB s from the top toolbar. Then search by the subject solicitation number. RFQs are in portable documents format (PDF). In order to download and view these documents, you will need the latest version of Adobe Acrobat Reader. This software is available free at https://www.adobe.com. This solicitation will not be made available through electronic data interchange (EDI). No hard copies of the solicitation are available.

From Presolicitation posted on Oct 02, 2025

Notice history

2
  1. Presolicitation Posted Oct 02, 2025
  2. Award Notice LATEST Posted Jan 23, 2026

Details

Solicitation number SPE8E926Q0001
Notice ID 6279a36c5d2c452aa19aaffd3e87e615
Award number SPE8E926D0005
Notice type Presolicitation
Product / Service (PSC) 4210
Place of performance USA
Archive date Nov 01, 2025

Award Information

Awardee
1
Total Awarded
$5,308,400.00
Award Date
Jan 23, 2026

Awardees

Company Name UEI CAGE Code Location
ELKHART BRASS MANUFACTURING COMPANY, LLC JSK5H64YJMF9 20266 N/A

Documents

No files available

View on SAM.gov

Contacts

primary
Tracey Marcus

Email

Agency

DEPT OF DEFENSE
DEFENSE LOGISTICS AGENCY
TROOP SUPPORT CONSTRUCTION & EQUIPMENT
DLA TROOP SUPPORT

Place of Performance


USA

Dates

Posted Oct 02, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Oct 17, 2025 9 months ago