333302-26-RF0010007 NMAH: Install Emergency Generator 33330226RF0010007
Summary
AI-generated · Mar 09, 2026Replace an aging 300 kW diesel emergency generator at the National Museum of American History with two new natural gas-fueled 500 kW generators to be installed on the rooftop adjacent to the existing unit. Include all necessary work to support installation and ensure full integration with the building’s systems, such as routing a new natural gas line, structural/mechanical/electrical/plumbing work, security, hazardous material abatement, and required architectural modifications for long-term functionality and maintenance.
Scope includes installing two 500 kW natural gas generators with onboard paralleling gear on a new rooftop platform; converting Room 4606 into an Emergency Electrical Room for a switchboard, ATSs, transformers, and panelboards; decommissioning the diesel unit; coordinating work in an operational museum with public access; creating early-condition documentation and construction BIM, plus a short-circuit study. Other requirements: protect finishes, relocate collections equipment via a qualified handler, install gas lines and related cabling and panels, perform two switchover events (temporary to existing power and then to new generators), reinforce the structure, complete testing and commissioning (including black start), conduct lead/asbestos testing where applicable, and integrate the new system with the Siemens BAS. Project duration is 669 calendar days; a full solicitation will be released later with electronic copies on SAM.gov.
The Smithsonian Institution ( Smithsonian ) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560. The applicable North American Industry Classification Codes ( NAICS ) are: 236220 - Commercial and Institutional Building Construction size standard is $45.0 million. 238210 Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million. Construction Budget: Over $10M. Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance. Specifically, work under this project includes but is not limited to: Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level. Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout. Existing conditions documentation early in the construction phase for implementation into BIM models. Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study. A short circuit study of the proposed project prior to equipment submittals. Protection of existing finishes in the areas of work. Subcontract with a qualified collections handler to relocate objects in the cabinets indicated in the logistics plan to storage location within the building. Collections handler and GC shall be insured and qualified to work in a collection s environment. Relocation of collections storage equipment including shelves and cabinets. Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up. Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building. Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation. Two switchover events: One for existing temporary emergency power supplies and one for temporary to new emergency power supplies. Reinforcement of the existing structure to support the new generators. Removal of the existing diesel generator at the lower level. Testing for lead and asbestos on existing piping at new points of connection. Mechanical work in the lower level to provide new fuel oil pumps. Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort. Work within and adjacent to sensitive 5th floor spaces including the Library and the Director s Suite. All work is within an operational Museum with both staff and the public present. Ceiling removals and installation on the 4th and 5th floors. Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane. Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction. Integration and coordination of new mechanical and generator control systems into existing Siemens BAS. Initial testing, commissioning and black start of new electrical emergency generator systems. The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff. Construction Schedule: Total period of performance allowed for construction is 669 calendar days from the Notice to Proceed. The full solicitation, request for proposals and supporting documents will be released on or about April 2025; however, there is no guarantee or implication of a guarantee this this project will be solicited. Electronic copies will be uploaded to SAM.gov site. This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response. THIS IS NOT A REQUEST FOR PROPOSAL.
From Presolicitation posted on Mar 03, 2026Notice history
1-
Presolicitation LATEST Posted Mar 03, 2026
Details
Award Information
Not yet awarded