Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation NONE Expired 3 notices 13 documents

333302-26-RF0010007 Install Emergency Generator at National Museum of American History (NMAH) 333302-26RF-0010007

Solicitation 333302-26RF-0010007 Copied Notice ID bcce2a650e2a44368180b5c13d9b3715 Copied SMITHSONIAN INSTITUTION — SMITHSONIAN INSTITUTION
SAM.gov
Posted
Jun 05, 2026
Deadline
Jun 16, 2026
Set-aside
NONE
NAICS
236220
PSC
Z1JA

Summary

AI-generated · Apr 16, 2026

Replace an aging 300 kW diesel emergency generator at the National Museum of American History with two 500 kW natural gas generators on a new rooftop platform, including all work to support installation and operation. This covers routing a new natural gas line through the building, necessary structural/mechanical/electrical/plumbing/security upgrades and hazardous material abatement, and architectural changes to ensure full functionality and future serviceability. Convert Room 4606 into an Emergency Electrical Room with a new switchboard, automatic transfer switches, transformers, and panelboards; decommission and remove the existing diesel generator; coordinate with an operating museum to keep the facility open to the public during construction; produce BIM coordination models and perform a short-circuit study prior to equipment submittals; protect finishes; and relocate collection storage equipment per the logistics plan using insured, qualified personnel.

Additional scope includes installing a new gas line to the roof, installing new conduit and cabling throughout the building, and removing obsolete conduit/panelboards; integrate the new generator controls with the existing Siemens BAS; conduct two switchover events from temporary to permanent power; reinforce the structure; perform lead/asbestos testing at new connections; complete related mechanical work (including fuel oil pumps); work near sensitive collection areas and high-security spaces with security escorts; ceiling work on multiple floors; hot-work with appropriate controls and filtration; and maintain safety barriers and dust control. The site remains an operational museum during construction. A site tour will be offered, and a formal questions/submittals process will apply; the project includes a subcontracting plan targeting at least 40% of subcontracting dollars to small businesses, including 7% to service-disabled veteran-owned small businesses.

The Smithsonian Institution ( Smithsonian ) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560. The applicable North American Industry Classification Codes ( NAICS ) are: 236220 - Commercial and Institutional Building Construction size standard is $45.0 million. 238210 Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million. Construction Budget: Over $10M. Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance. Specifically, work under this project includes but is not limited to: Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level. Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout. Existing conditions documentation early in the construction phase for implementation into BIM models. Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study. A short circuit study of the proposed project prior to equipment submittals. Protection of existing finishes in the areas of work. Subcontract with a qualified collections handler to relocate objects in the cabinets indicated in the logistics plan to storage location within the building. Collections handler and GC shall be insured and qualified to work in a collection s environment. Relocation of collections storage equipment including shelves and cabinets. Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up. Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building. Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation. Two switchover events: One for existing temporary emergency power supplies and one for temporary to new emergency power supplies. Reinforcement of the existing structure to support the new generators. Removal of the existing diesel generator at the lower level. Testing for lead and asbestos on existing piping at new points of connection. Mechanical work in the lower level to provide new fuel oil pumps. Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort. Work within and adjacent to sensitive 5th floor spaces including the Library and the Director s Suite. All work is within an operational Museum with both staff and the public present. Ceiling removals and installation on the 4th and 5th floors. Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane. Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction. Integration and coordination of new mechanical and generator control systems into existing Siemens BAS. Initial testing, commissioning and black start of new electrical emergency generator systems. The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff. Construction Schedule: Total period of performance allowed for construction is 669 calendar days from the Notice to Proceed. This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response. TOUR OF THE SITE: The tour will be conducted on April 28, 2026. Offerors can contact Christine Grant at grantca@si.edu to schedule. QUESTIONS/ SUBMITTALS It is desired that all questions be sent in word format, sequentially numbered for example first questions 1, 2, 3, second set of questions 4, 5, 6, etc. to grantca@si.edu . It is requested that all questions be sent in by May 12, 2026 no later than 3PM ET. Proposals must be submitted via Dropbox June 16, 2026 no later than 3PM ET using the following link: https://www.dropbox.com/request/nYiuJ2GoTec73ZIPw6mV . Please upload two separate files, clearly labeled Technical and Cost. SUBCONTRACTING PLAN REQUIREMENTS: The successful Offeror submits with their proposal a Small Business Subcontracting Plan which will be evaluated for compliance with FAR 19.7. For the purposes of this project, the following goals are considered reasonable and achievable during the term of the contract: 40 % a minimum of the planned subcontracting dollars to be placed with small business concerns. (The following are subsets of the small business goal): 7 % a minimum of the planned subcontracting dollars to be placed with service-disabled Veteran owned small business (SDVSB) concerns

From Combined Synopsis/Solicitation posted on Apr 15, 2026

1. Amendment 1 - Sign In Sheet (see attachments). 2. Amendment 2 - RFI's ( see attachments) The Smithsonian Institution ( Smithsonian ) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560. The applicable North American Industry Classification Codes ( NAICS ) are: 236220 - Commercial and Institutional Building Construction size standard is $45.0 million. 238210 Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million. Construction Budget: Over $10M. Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance. Specifically, work under this project includes but is not limited to: Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level. Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout. Existing conditions documentation early in the construction phase for implementation into BIM models. Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study. A short circuit study of the proposed project prior to equipment submittals. Protection of existing finishes in the areas of work. Subcontract with a qualified collections handler to relocate objects in the cabinets indicated in the logistics plan to storage location within the building. Collections handler and GC shall be insured and qualified to work in a collection s environment. Relocation of collections storage equipment including shelves and cabinets. Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up. Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building. Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation. Two switchover events: One for existing temporary emergency power supplies and one for temporary to new emergency power supplies. Reinforcement of the existing structure to support the new generators. Removal of the existing diesel generator at the lower level. Testing for lead and asbestos on existing piping at new points of connection. Mechanical work in the lower level to provide new fuel oil pumps. Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort. Work within and adjacent to sensitive 5th floor spaces including the Library and the Director s Suite. All work is within an operational Museum with both staff and the public present. Ceiling removals and installation on the 4th and 5th floors. Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane. Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction. Integration and coordination of new mechanical and generator control systems into existing Siemens BAS. Initial testing, commissioning and black start of new electrical emergency generator systems. The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff. Construction Schedule: Total period of performance allowed for construction is 669 calendar days from the Notice to Proceed. This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response. TOUR OF THE SITE: The tour will be conducted on April 28, 2026. Offerors can contact Christine Grant at grantca@si.edu to schedule. QUESTIONS/ SUBMITTALS It is desired that all questions be sent in word format, sequentially numbered for example first questions 1, 2, 3, second set of questions 4, 5, 6, etc. to grantca@si.edu . It is requested that all questions be sent in by May 12, 2026 no later than 3PM ET. Proposals must be submitted via Dropbox June 16, 2026 no later than 3PM ET using the following link: https://www.dropbox.com/request/nYiuJ2GoTec73ZIPw6mV . Please upload two separate files, clearly labeled Technical and Cost. SUBCONTRACTING PLAN REQUIREMENTS: The successful Offeror submits with their proposal a Small Business Subcontracting Plan which will be evaluated for compliance with FAR 19.7. For the purposes of this project, the following goals are considered reasonable and achievable during the term of the contract: 40 % a minimum of the planned subcontracting dollars to be placed with small business concerns. (The following are subsets of the small business goal): 7 % a minimum of the planned subcontracting dollars to be placed with service-disabled Veteran owned small business (SDVSB) concerns

From Combined Synopsis/Solicitation posted on May 26, 2026

1. Amendment 1 - Sign In Sheet (see attachments). 2. Amendment 2 - RFI's ( see attachments) 3. Amendment 3 - RFI follow-up ( see attachments) The Smithsonian Institution ( Smithsonian ) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560. The applicable North American Industry Classification Codes ( NAICS ) are: 236220 - Commercial and Institutional Building Construction size standard is $45.0 million. 238210 Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million. Construction Budget: Over $10M. Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance. Specifically, work under this project includes but is not limited to: Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level. Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout. Existing conditions documentation early in the construction phase for implementation into BIM models. Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study. A short circuit study of the proposed project prior to equipment submittals. Protection of existing finishes in the areas of work. Subcontract with a qualified collections handler to relocate objects in the cabinets indicated in the logistics plan to storage location within the building. Collections handler and GC shall be insured and qualified to work in a collection s environment. Relocation of collections storage equipment including shelves and cabinets. Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up. Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building. Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation. Two switchover events: One for existing temporary emergency power supplies and one for temporary to new emergency power supplies. Reinforcement of the existing structure to support the new generators. Removal of the existing diesel generator at the lower level. Testing for lead and asbestos on existing piping at new points of connection. Mechanical work in the lower level to provide new fuel oil pumps. Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort. Work within and adjacent to sensitive 5th floor spaces including the Library and the Director s Suite. All work is within an operational Museum with both staff and the public present. Ceiling removals and installation on the 4th and 5th floors. Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane. Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction. Integration and coordination of new mechanical and generator control systems into existing Siemens BAS. Initial testing, commissioning and black start of new electrical emergency generator systems. The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff. Construction Schedule: Total period of performance allowed for construction is 669 calendar days from the Notice to Proceed. This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response. TOUR OF THE SITE: The tour will be conducted on April 28, 2026. Offerors can contact Christine Grant at grantca@si.edu to schedule. QUESTIONS/ SUBMITTALS It is desired that all questions be sent in word format, sequentially numbered for example first questions 1, 2, 3, second set of questions 4, 5, 6, etc. to grantca@si.edu . It is requested that all questions be sent in by May 12, 2026 no later than 3PM ET. Proposals must be submitted via Dropbox June 16, 2026 no later than 3PM ET using the following link: https://www.dropbox.com/request/nYiuJ2GoTec73ZIPw6mV . Please upload two separate files, clearly labeled Technical and Cost. SUBCONTRACTING PLAN REQUIREMENTS: The successful Offeror submits with their proposal a Small Business Subcontracting Plan which will be evaluated for compliance with FAR 19.7. For the purposes of this project, the following goals are considered reasonable and achievable during the term of the contract: 40 % a minimum of the planned subcontracting dollars to be placed with small business concerns. (The following are subsets of the small business goal): 7 % a minimum of the planned subcontracting dollars to be placed with service-disabled Veteran owned small business (SDVSB) concerns

From Combined Synopsis/Solicitation posted on Jun 05, 2026

Notice history

3
  1. Combined Synopsis/Solicitation Posted Apr 15, 2026 View
  2. Combined Synopsis/Solicitation Posted May 26, 2026
    • Description: Description was updated
  3. Combined Synopsis/Solicitation LATEST Posted Jun 05, 2026
    • Description: Description was updated

Details

Solicitation number 333302-26RF-0010007
Notice ID bcce2a650e2a44368180b5c13d9b3715
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Z1JA
NAICS 236220
Set-aside No Set aside used
Place of performance Washington, District of Columbia
Archive date Jul 01, 2026

Award Information

Not yet awarded

Contacts

primary
Christine Grant

Email

Agency

SMITHSONIAN INSTITUTION
SMITHSONIAN INSTITUTION
SMITHSONIAN INSTITUTION

Place of Performance

Washington, District of Columbia
USA

Dates

Posted Jun 05, 2026 2 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 16, 2026 1 month ago