Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 2 notices 5 documents

1st Armored Division (1AD) Combat Aviation Brigade (CAB) Flight Line Fire Extinguisher 12-Year Maintenance and Service W91151-26-Q-A019

Solicitation W91151-26-Q-A019 Copied Notice ID a89f6b0b8cac40d9a132dc4d50930f63 Copied DEPT OF DEFENSE — W6QM MICC-FDO FT HOOD
SAM.gov
Posted
Feb 23, 2026
Deadline
Feb 25, 2026
Set-aside
SBA
NAICS
811310
PSC
J012

Summary

AI-generated · Feb 20, 2026

Non-personal services to perform the 12-year maintenance, inspection, servicing, and recharge of 56 government-owned 150 lb BC (Amerex 490) fire extinguishers. Contractor will transport extinguishers from Biggs Army Airfield facilities, perform the services in compliance with NFPA 10 and the manufacturer’s manual, and return them. Work is to be completed in lots of 6 extinguishers every three days, over an overall timeframe of about five weeks; this is a one-time requirement.

This requirement is for non-personal services to perform the 12-year maintenance, inspection, servicing, and recharge of 56 government-owned 150lb BC (Amerex 490) fire extinguishers. The contractor is required to transport the fire extinguishers from Biggs Army Airfield facilities, perform the required services in compliance with NFPA 10 and the manufacturer's manual, and return them. The services are to be completed in lots of 6 each, every three days, with an expected total duration of approximately 5 weeks. This is a one-time requirement with a period of performance from 02 March 2026 to 06 April 2026.

From Solicitation posted on Feb 19, 2026

This requirement is for non-personal services to perform the 12-year maintenance, inspection, servicing, and recharge of 56 government-owned 150lb BC (Amerex 490) fire extinguishers. The contractor is required to transport the fire extinguishers from Biggs Army Airfield facilities, perform the required services in compliance with NFPA 10 and the manufacturer's manual, and return them. The services are to be completed in lots of 6 each, every three days, with an expected total duration of approximately 5 weeks. This is a one-time requirement with a period of performance from 02 March 2026 to 06 April 2026.

From Solicitation posted on Feb 23, 2026

Notice history

2
  1. Solicitation Posted Feb 19, 2026 View
  2. Solicitation LATEST Posted Feb 23, 2026
    No changes from previous notice

Details

Solicitation number W91151-26-Q-A019
Notice ID a89f6b0b8cac40d9a132dc4d50930f63
Notice type Solicitation
Product / Service (PSC) J012
NAICS 811310
Place of performance El Paso, Arkansas
Archive date Mar 12, 2026

Award Information

Not yet awarded

Contacts

primary
Marvin E. Hopkins

Email

Phone

secondary
Komlan E. Dougah

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
418TH CSB
W6QM MICC-FDO FT HOOD

Place of Performance

El Paso, Arkansas
USA

Dates

Posted Feb 23, 2026 5 months ago
Last Updated Aug 06, 2026 2 days ago
Due Feb 25, 2026 5 months ago