19MU3026P0102 PR15769215 - MCT-FAC-SRVC7901- PMSC for UPS PR15769215
Summary
AI-generated · Dec 31, 2025Provide all materials, supervision, labor, tools, and equipment to perform preventive maintenance on UPS systems and related components, including UPS modules, fans, external battery modules (EBM), batteries, circuit breakers, electronic modules, wiring, and auxiliary devices (per the attached equipment list). All personnel in the work area must wear and/or use appropriate safety protection; any questions or injuries must be reported to the Post COR and the Occupational Safety and Health Officer (POSHO) immediately. The contractor must supply Safety Data Sheets (SDS) for every chemical used on site, with copies provided to the COR for approval.
Submit to the COR a list of necessary parts and materials. Provide emergency UPS support within 24 hours of being contacted by the COR, priced at an hourly rate. The Government will not supply equipment for UPS testing; the contractor must provide testing tools such as multimeters, current leakage testers, power meters, megger, vacuum blower, wire strippers, and wrenches.
The contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity should wear and /or use appropriate safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post COR and Occupation Safety and Health Officer (POSHO) immediately. The Contractor will provide an SDS to the COR immediately upon delivery of each chemical to be used by Contractor personnel on-site. The SDS copies will be provided to COR for approval. The systems and components to be maintained include UPS module (s), fans, external battery module (EBM), batteries, circuit breakers, electronic module (s), wiring and auxiliary devices. The attached equipment list provides details. 1. The contractor shall provide the COR with a list of necessary parts and materials. 2. The contractor shall provide emergency assistance for UPS support, priced at an hourly rate, within 24 hrs of being contacted by the COR. 3. The Government will not provide equipment for UPS testing: Multimeters, current leakage tester, power meter, megger, vacuum blower, wire stripper, wrench.
From Justification posted on Dec 30, 2025Notice history
1-
Justification LATEST Posted Dec 30, 2025
Details
Award Information
Contacts
Phone
Agency
Place of Performance
OMN