191Z1025R0009 - FAC EPO and UPS for JUCR 191Z1025R0009-002
Summary
AI-generated · Aug 29, 2025Furnish and install a 30 kW central UPS and an emergency power-off (EPO) switch with wiring to support JUCR facilities. The EPO switch must be placed at the strike side on the interior (room-side) of all exit doors and, when activated, must disconnect the room’s dedicated HVAC, lighting, and all electrical feeds to telecommunications equipment simultaneously. All work must comply with Office of Overseas Buildings Operations (OBO) safety requirements and include the necessary wiring and connections.
The EPO assembly must meet NFPA 645.10 requirements. The project scope includes furnishing and installing the 30 kW central UPS and the associated EPO switch per the specified safety standards.
The United States Embassy in Baghdad is soliciting proposal of a project to provide UPS 30 KW and emergency Power off button with wiring, Comply with OBO requirements to ensure safety. Provide a single combined operation switch at the strike side on the interior (room side) of all exit doors. This switch shall comply with NFPA 645.10 and disconnect the room dedicated HVAC system, lighting, and electrical feeds to all electrical telecommunications equipment simultaneously, also furnishing and installation of 30 KW central UPS.
From Combined Synopsis/Solicitation posted on Aug 28, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
IRQ