Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 2 notices

17--STRUCTURAL COMPONEN SPRPA126RYB03

Solicitation SPRPA126RYB03 Copied Notice ID bc37a8d913f84dfa8270dc3af72a5bdd Copied DEPT OF DEFENSE — DLA AVIATION AT PHILADELPHIA, PA
SAM.gov
Posted
Dec 24, 2025
Deadline
Feb 09, 2026
Set-aside
None
NAICS
N/A
PSC
1720

Summary

AI-generated · Dec 25, 2025

A new spare for a structural component is being sought in a flight-critical application, with 20 units to be delivered FOB origin. No drawings are available, and the part must be approved through engineering source approval by the design control activity to maintain quality. Only government-approved sources have been solicited; any alternate source must qualify under the approved procedures, and the government requires data or knowledge held by the approved source(s) to maintain part quality. If you are not yet approved, you must submit the required information per NAVSUP WSS source approval brochures with your offer; failure to provide all required data will exclude you from award. If the approval process cannot be completed in time, the award may proceed to meet fleet support needs.

The acquisition is set aside for small business concerns, with the specific set-aside type (e.g., HUBZone, SDVOSB, EDWOSB/WOSB, etc.) to be specified in the solicitation. Award will depend on meeting qualification requirements at time of award (per FAR 52.209-1). If your source approval is still being evaluated, you may still be considered if you provide the necessary documentation; alternatively, the government may continue with award based on fleet support needs. Interested parties may identify their capability within 15 days of the notice.

NSN 7R-1720-016668086-EY, TDP VER 001, QTY 20 EA, DELIVERY FOB ORIGIN. This is a NEW SPARES requirement. No drawings are available for this requirement. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing/repair knowledge by the qualified source(s) require acquisition/repair of the part from the approved source(s). The approved source(s) retain data rights,manufacturing/repair knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. The subject item requires Government source approval prior to contract award, as the item is flight critical and/or the technical data available has not been determined adequate to support acquisition via full and open competition. Only the source(s) previously approved by the Government for this item have been solicited. The time required for approval of a new source is normally such that an award cannot be delayed pending approval of a new source. If you are not an approved source you must submit, together with your proposal, the information detailed in one of the NAVSUP Weapon Systems Support (NAVSUP WSS)Source Approval Information Brochures listed below. Spares: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Sup port/Business-Opps/ Repair: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP -Weapon-Systems-Support/Business-Opps/ technical data required to be submitted based on your company's experience in production of the same or similar item, or if this is an item you have never made. If your request for source approval is currently being evaluated at NAVSUP WSS submit with your offer a copy of the cover letter which forwarded your request for source approval. Offers received which fail to provide all data required by the Source Approval Brochure or document previous submission of all data required by the Source Approval Brochure will not be considered for award under this solicitation. Please note, if evaluation of a source approval request submitted hereunder cannot be processed in time and/or approval requirements preclude the ability to obtain subject items in time to meet Government requirements, award of the subject requirement may continue based on Fleet support needs. The NAVSUP WSS Commercial Item Identification Brochure is now available at: "https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Bus iness-Opps/"The proposed acquisition is 100% set aside for small business concerns (seeFAR clause 52.219-6, Notice of Total Small Business Set-Aside). The specifictype of set-aside will be addressed in the solicitation through inclusion ofone of the appropriate clauses listed here: FAR 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award FAR 52.219-27 Notice of Service-Disabled Veteran-Owned Small BusinessSet-Aside FAR 52.219-29 Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business Concerns FAR 52.219-30 Notice of Set-Aside for Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program DFARS 252.226-7000 Notice of Historically Black College or University andMinority Institution Set-AsideAward will be made only if the offeror, the product/service, or themanufacturer meets the qualification requirement(s) at time of award, inaccordance with FAR clause 52.209-1. The solicitation identifies the officewhere additional information can be obtained concerning qualificationrequirements and is cited in each individual solicitation.Based upon market research, the Government is not using the policies containedin FAR Part 12, Acquisition of Commercial Items, in its solicitation for thedescribed supplies or services. However, interested persons may identify tothe contracting officer their interest and capability to satisfy theGovernment's requirement with a commercial item within 15 days of this notice.

From Presolicitation posted on Dec 24, 2025

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|ISO 9001 or its equivalent |||||||| TIME OF DELIVERY (JUNE 1997)|20|0001|20 EA|BEST AVAILABLE|||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRPA1|TBD|TBD|SEE SCHEDULE|TBD||||||||N/A| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,|45 DAYS AFTER THE DATE OF THE LAST DELIVERY UNDER THIS CONTRACT,||||| WARRANTY OF DATA - BASIC (MAR 2014)|2||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250||||||||||| INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)|2||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| This is a NEW SPARES requirement. No drawings are available for this requirement. For Critical Safety Items (CSI), DFARS clause 252.209-7010, Identification of Critical Safety Items, is incorporated by reference. For items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx. As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. For items for which Government inspection and acceptance will be conducted at the source, DLAD clause 52.246-9004, Product Verification Testing, is incorporated by reference. DLAD clauses can be viewed at http://www.dla.mil/Acquisition/Pages/DLAD.aspx. As applicable, DFARS clause 252.242-7005, Contractor Business Systems, is incorporated by reference. All Clauses not applicable to this document are self-deleting. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.5 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;628523-1R; drawing number ( ;80020; ) ;MOST CURRENT REVISION; , Revision ;APPLIES; and all details and specifications referenced therein. 1.6 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.7 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=MPR 10 |80020| F| |D| | | | DRAWING DATA=MPR 1072 |80020| | |D| | | | DRAWING DATA=MPR 1075 |80020| | |D| | | | DRAWING DATA=MPR 1223 |80020| C| |D| | | | DRAWING DATA=NAEC ENG-6518 |80020|BP| |D| | | | DRAWING DATA=12-50303 |80020|AH| |D| | | | DRAWING DATA=509441 |80020|AC| |D| | | | DRAWING DATA=613602 |80020| P| |D| | | | DRAWING DATA=628523 |80020| A| |D| | | | 3. REQUIREMENTS Unique Requirements: a.All records pertaining to ALRE CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS 1.The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a.Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b.Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c.Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as de-fined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating 100% conformance to the test and evaluation elements cited in the First Article Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article; ii. Failure to meet any of the conditions in the First Article Testing "Requirements" paragraph above or the First Article Testing ?Testing and evaluation? paragraph above shall be cause for rejection. d. Delivery: i.The accepted First Article exhibit may be delivered and counted along with contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 3. Production Lot Special Tests: N/A 4. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 5. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear the symbols of accreditation and the accreditation body. a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;APPLIES; ) HEAT TREAT ( ;APPLIES; ) WELDING ( ; ; ) CADMIUM PLATING ( ; ; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ; ; ) FORGING(S) ( ;MPR 10,MPR 1072,MPR 1075,MPR 1223; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.3.1 Dimensional test (special) ;APPLIES; 4.3.2 Requirements of: ;NAWC LAKEHURST; 4.3.3 Form ;APPLIES; 4.3.4 Fit ;N/A; 4.3.5 Function ;N/A; 4.3.6 Compliance with drawing ( ;80020; ) ;628523; , Revision ;MOST CURRENT REVISION; and specifications referenced therein. 4.4 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.5 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.6 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.6.1 The QAR shall be present to witness all First Article Testing. 4.6.2 The following additional personnel shall witness the First Article Testing: ; ; 4.7 Disposition of FAT samples 4.7.1 ; ; Sample(s) may be destroyed during testing. 4.7.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.8 Test Sample Coating Instructions 4.8.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.9 Notice to Government of Testing at the contractors facility. 4.9.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;80020; ; ), Part Number ;628523; ; , Revision ;MOST CURRENT REVISION; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.10 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.11 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;ALL ACTUAL DIMENSIONS OF MAJOR/CRITICAL CHARACTERISTICS ARE TO BE RECORDED.RECORD TIME AND AMBIENT TEMPERATURE WHEN MEASUREMENTS ARE TAKEN.CERTIFICATIONS TO BE ON FILE.; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.12 SPECIAL INSPECTION REQUIREMENTS ( ;APPLIES; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ; ; ) PENETRANT INSPECTION ( ; ; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.13 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ; ; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10142): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUESTAS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall beprovided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ 12. DATE OF FIRST SUBMISSION Concurrently with de-livery of FAT Items 16. REMARKS Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Assembly per Drawing 628523. c. Identification per Drawing 628523, 509441, 613602. d. Welding per Drawing 628523. e. Material properties per Drawing 12-50303, 509441. f. Surface finish of bare metal per Drawing 12-50303, 613602. g. Heat treatment per Drawing 12-50303, 509441. h. Hardness measurements per Drawing 12-50303, 509441. i. Magnetic particle inspection per Drawing 12-50303, 509441, 613602. j. Dimensional inspection per Drawing 12-50303, 509441, 613602. k. Thread dimensions and designations per Note 5 of Drawing 509441. Documentation shall include verification that the pitch and functional diameters were 100% inspected in accordance with System 22 of FED-STD-H28/20. l. Manufacturing and testing per Drawing 613602. DATE OF FIRST SUBMISSION=ASREQ 12. DATE OF FIRST SUBMISSION Concurrently with Final Inspection 16. REMARKS Data Requirements a. Copies of all approved requests for variations. b. Assembly per Drawing 628523. c. Identification per Drawing 628523, 509441, 613602. d. Welding per Drawing 628523. e. Material properties per Drawing 12-50303, 509441. f. Surface finish of bare metal per Drawing 12-50303, 613602. g. Plating per Drawing 12-50303. h. Heat treatment per Drawing 12-50303, 509441. i. Hardness measurements per Drawing 12-50303, 509441. j. Magnetic particle inspection per Drawing 12-50303, 509441, 613602. k. Dimensional inspection per Drawing 12-50303, 509441, 613602. l. Thread dimensions and designations per Note 5 of Drawing 509441. Documentation shall include verification that the pitch and functional diameters were 100% inspected in accordance with System 22 of FED-STD-H28/20. m. Coating per Drawing 613602. n. Manufacturing and testing per Drawing 613602. DATE OF FIRST SUBMISSION=090 DAC The Welding Procedures will be used by the Government to verify contractor designated welding responsibilities implement weld procedures for each cont ractor, subcontractor or welding entity performing welding on specific work specifications 12. DATE OF FIRST SUBMISSION 90 D.A.C. 16. REMARKS (Block 5) Data Requirements a. Weld procedure IAW NAVSEA S9074-AR-GIB-010/278 Revision NONE, para 4.2 per Drawing 628523. (Block 13) DATE OF SUBSEQUENT SUBMMISION: Approval or reason for disapproval shall be given by NAVAIRWARCENACDIVLKE via the P.C.O. NLT 45 days after disapproval. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL14000 Bldg 596 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC The Welding Procedures will be used by the Government to verify contractor designated welding responsibilities implement weld procedures for each cont ractor, subcontractor or welding entity performing welding on specific work specifications 12. DATE OF FIRST SUBMISSION 90 D.A.C. 16. REMARKS (Block 5 ) Data Requirements a. The Weld Procedure Qualification Test Report, including all supporting test reports and documentation, IAW NAVSEA S9074-AQ-GIB-010/248 Revision 1, para 4.2.3 and 4.6 Drawing 628523. (Block 13) DATE OF SUBSEQUENT SUBMMISION: Approval or reason for disapproval shall be given by NAVAIRWARCENACDIVLKE via the P.C.O. NLT 45 days after disapproval. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL14000 Bldg 596 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=ASREQ The Welding Procedures will be used by the Government to verify contractor designated welding responsibilities implement weld procedures for each cont ractor, subcontractor or welding entity performing welding on specific work specifications 12. DATE OF FIRST SUBMISSION (See Block 16) 16. REMARKS (Block 5) CONTRACT REFERENCE a. Evidence of Welder Performance Qualification, including supporting test results and documentation, IAW NAVSEA S9074-AQ-GIB-010/248 Revision 1, para 5.2 per Drawing 628523. (Block 12) DATE OF FIRST SUBMISSION ? 30 days prior to production. (Block 13) Provide qualification evidence for all welders. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 12. DATE OF FIRST SUBMISSION 90 D.A.C. (Block 5) CONTRACT REFERENCE a. Evidence of Level III Certification IAW T9074-AS-GIB-010/271^ para 1.6 for the individual who approved the Welders Qualification Training Program IAW NAVSEA S9074-AQ-GIB-010/248 para 5.2.3.1, per Drawing 628523. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 12. DATE OF FIRST SUBMISSION 90 D.A.C. 16. REMARKS (Block 5) CONTRACT REFERENCE a. Visual Inspection Written Procedure to be used to visually inspect all welds IAW T9074-AS-GIB-010/271^ para 8.3 and 1.7 thru 1.7.3 per Drawing 628523. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 12. DATE OF FIRST SUBMISSION 90 D.A.C. 16. REMARKS (Block 5) CONTRACT REFERENCE a. Evidence of approval of the Welder Qualification Training Program IAW NAVSEA S9074-AQ-GIB-010/248 Revision 1, para 5.2.3.1(d), per Drawing 628523. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000 DATE OF FIRST SUBMISSION=090 DAC 12. DATE OF FIRST SUBMISSION 90 D.A.C. 16. REMARKS (Block 5) CONTRACT REFERENCE A. Evidence of Maintenance of Qualification for all welders IAW NAVSEA S9074-AQ-GIB-010/248 Revision 1, para 5.2.11 and 5.2.12 per Drawing 628523. (Block 14) Addresses for NAVAIR Codes: NAVAIRWARCENACDIVLKE Code BL32300 Bldg 562 HWY 547 JOINT BASE MDL, NJ 08733-5000 NAVAIRWARCENACDIVLKE Code BL41600 Bldg 148 HWY 547 JOINT BASE MDL, NJ 08733-5000

From Solicitation posted on Jan 13, 2026

Notice history

2
  1. Presolicitation Posted Dec 24, 2025
  2. Solicitation LATEST Posted Jan 13, 2026
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Feb 09, 2026Feb 12, 2026
    • NAICS Codes: None336413

Details

Solicitation number SPRPA126RYB03
Notice ID bc37a8d913f84dfa8270dc3af72a5bdd
Notice type Presolicitation
Product / Service (PSC) 1720
Archive date Feb 24, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
THOMAS KUHNLE, APBB.15, PHONE (215)737-4024, FAX (215)737-7149, EMAIL THOMAS.KUHNLE@DLA.MIL

Email

Agency

DEPT OF DEFENSE
DEFENSE LOGISTICS AGENCY
DLA AVIATION
DLA AVIATION PHILADELPHIA
DLA AVIATION AT PHILADELPHIA, PA

Dates

Posted Dec 24, 2025 7 months ago
Last Updated Aug 06, 2026 1 day ago
Due Feb 09, 2026 5 months ago