159th Fighter Wing HVAC Replacement W50S7Z25CA003
Summary
AI-generated · Aug 27, 2025Replace two chiller units at Building 31 and Hangar 5, NAS JRB New Orleans (Belle Chasse, LA). The contractor will supply all labor, materials, equipment, and supervision to install the new chillers in accordance with applicable codes, standards, and base specifications, to restore reliability and energy efficiency for mission-critical operations.
Awarded to Rashad AC and Heating LLC for $239,672, with coordination through the New Orleans Regional SBA Office.
The Louisiana Air National Guard (LA ANG), 159th Fighter Wing, awarded a Sole Source 8(a) contract, in coordination with the New Orleans Regional SBA Office, to replace chiller units at Building 31 and Hangar 5, at NAS JRB New Orleans, Belle Chasse, Louisiana. The current systems have reached the end of their useful service lives and require replacement to ensure continued operational reliability and energy efficiency in support of mission-critical functions. The contractor shall furnish all labor, materials, equipment, and supervision necessary to complete the installation in accordance with applicable codes, standards, and base specifications.
From Award Notice posted on Aug 26, 2025Notice history
1Details
Award Information
Award Notices
Posted: Aug 26, 2025
The Louisiana Air National Guard (LA ANG), 159th Fighter Wing, awarded a Sole Source 8(a) contract, in coordination with the New Orleans Regional SBA Office, to replace chiller units at Building 31 and Hangar 5, at NAS JRB New Orleans, Belle Chasse, Louisiana. The current systems have reached the en...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| RASHAD AC AND HEATING LLC | W1QEMTLHTX97 | 80CA6 | New Orleans, LA |
Contacts
Phone
Phone
Agency
Place of Performance
USA