Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 1 notice 2 documents

13th ACSC Stratasys Origin Two and Stratasys F370CR 3D Printers W56ZLW26Q0019

Solicitation W56ZLW26Q0019 Copied Notice ID c182133950af438f8b1d052dbc71bdec Copied DEPT OF DEFENSE — 0418 AQ HQ CONTRACTING SUP
SAM.gov
Posted
Jul 07, 2026
Deadline
Jul 15, 2026
Set-aside
NONE
NAICS
333248
PSC
3695

Summary

AI-generated · Jul 08, 2026

Turnkey additive manufacturing solution to establish an on-site capability for producing replacement parts at Fort Hood, TX. Includes two industrial-grade 3D printers: Stratasys Origin Two (P3/DLP) with a build volume of 192 mm × 108 mm × 370 mm for high-accuracy end-use parts with complex geometries, and Stratasys F370CR (FDM) with a build volume of 355 × 254 × 355 mm capable of printing high-strength carbon fiber–reinforced thermoplastics. The package encompasses turnkey installation, configuration, and calibration, on-site manufacturer-led training for operators, all software licenses and initial consumables, and a comprehensive warranty with technical support.

Training will be scheduled after installation and verification of operation and will cover system operation, job setup, maintenance, and troubleshooting. Questions must be submitted in writing to the designated points of contact.

This requirement is for a turnkey additive manufacturing solution to establish an organic capability for producing replacement parts at Fort Hood, TX. The acquisition includes two specific industrial-grade 3D printers, along with all necessary services for immediate and sustained operation: - Stratasys Origin Two (Polymer Printer): An industrial-grade 3D printer utilizing programmable photopolymerization (P3/DLP) technology. It must have a minimum build volume of 192 mm x 108 mm x 370 mm and be capable of producing high-accuracy end-use parts with complex geometries. - Stratasys F370CR (Composite-Ready Printer): An industrial-grade Fused Deposition Modeling (FDM) 3D printer specifically designed for producing composite parts. It must have a minimum build volume of 355 x 254 x 355 mm and be capable of printing with high-strength, carbon fiber-reinforced thermoplastics. The requirement also includes turnkey installation, configuration, and calibration of all equipment; manufacturer-led on-site training for operators; all necessary software licenses and initial consumables; and a comprehensive warranty and technical support package. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes but not limited to system operation, job setup, maintenance, and troubleshooting. All questions must be submitted in writing to the POCs listed below no later than 04:00 pm (CST), 9 July 2026. komlan.e.dougah.mil@army.mil austin.c.sanderson.mil@army.mil

From Solicitation posted on Jul 07, 2026

Notice history

1
  1. Solicitation LATEST Posted Jul 07, 2026

Details

Solicitation number W56ZLW26Q0019
Notice ID c182133950af438f8b1d052dbc71bdec
Notice type Solicitation
Product / Service (PSC) 3695
NAICS 333248
Set-aside No Set aside used
Place of performance Fort Hood, Texas
Archive date Jul 30, 2026

Award Information

Not yet awarded

Contacts

primary
Austin Sanderson

Email

Phone

secondary
Komlan Dougah

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
418TH CSB
0418 AQ HQ CONTRACTING SUP

Place of Performance

Fort Hood, Texas 76544
USA

Dates

Posted Jul 07, 2026 1 month ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 15, 2026 3 weeks ago