Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 2 notices 2 documents

13 ACSC 3D Metal Printer PANMCC-26-P-047957

Solicitation PANMCC-26-P-047957 Copied Notice ID d76ba2e2cdb647a2b594243c5d8b97ca Copied DEPT OF DEFENSE — 0418 AQ HQ CONTRACTING SUP
SAM.gov
Posted
Jun 29, 2026
Deadline
Jul 09, 2026
Set-aside
SBA
NAICS
333248
PSC
3695

Summary

AI-generated · Jun 30, 2026

Complete metal 3D printing system: Xact Metal 200G with on-site installation by OEM technicians, including delivery, unboxing, utility hookups, system calibration, and operational verification at Fort Hood, TX. Features include a single 400-W laser, extended build height (11.5"), reactive-enabled capabilities for aluminum and other reactive metals, an integrated powder-handling glove box, an OEM powder sieving station for material reclamation, and a metal powder vacuum for safe cleaning and hazard mitigation.

OEM-led training bundled with the system: 2–3 days of intensive, on-site, hands-on operator and safety training at Fort Hood after installation and verification, covering system operation, powder handling, reactive-metal safety, job setup, maintenance, and troubleshooting.

Xact Metal 200G Metal 3D Printer System (With Installation and OEM OnSite Training) Complete metal powder bed fusion 3D printing system, including physical delivery, onsite installation, OEMled operator training, and operational verification. System shall be configured and supplied with: Laser Configuration: Single (1) 400-Watt Laser Build Height: Extended Build Height (11.5") Reactive Enabled: Supports safe processing of aluminum and other reactive metals Glove Box: Integrated powderhandling glove box. Sieving Station: OEM powder sieving station for material reclamation. Safety Equipment: Specialized metal powder vacuum for safe cleaning and mitigation of inhalation/combustion hazards. Installation Services: Onsite unboxing, physical setup, utility connection, and system calibration /verification by certified OEM technicians at Fort Hood, TX. OEM-Led Training (Bundled): 2-3 days of intensive, onsite, hands-on operational and safety training at Fort Hood, TX. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting. All questions must be submitted in writing to the POCs listed below no later than 11:59 pm (CST), 6 July 2026. marvin.e.hopkins4.mil@army.mil donelle.h.white.mil@army.mil jasper.l.cruz.mil@army.mil

From Solicitation posted on Jun 29, 2026

UPDATE 08 JUL 2026: Amendment 0001 has been posted to this solicitation. The purpose of this amendment is to revise the technical specifications to include a requirement for Spot Size: 50 microns. Please see the attached SF-30for full details. Offerors must formally acknowledge receipt of this amendment in their quote submission. Xact Metal 200G Metal 3D Printer System (With Installation and OEM OnSite Training) Complete metal powder bed fusion 3D printing system, including physical delivery, onsite installation, OEMled operator training, and operational verification. System shall be configured and supplied with: Laser Configuration: Single (1) 400-Watt Laser Build Height: Extended Build Height (11.5") Reactive Enabled: Supports safe processing of aluminum and other reactive metals Glove Box: Integrated powderhandling glove box. Sieving Station: OEM powder sieving station for material reclamation. Safety Equipment: Specialized metal powder vacuum for safe cleaning and mitigation of inhalation/combustion hazards. Installation Services: Onsite unboxing, physical setup, utility connection, and system calibration /verification by certified OEM technicians at Fort Hood, TX. OEM-Led Training (Bundled): 2-3 days of intensive, onsite, hands-on operational and safety training at Fort Hood, TX. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting. All questions must be submitted in writing to the POCs listed below no later than 11:59 pm (CST), 6 July 2026. marvin.e.hopkins4.mil@army.mil donelle.h.white.mil@army.mil jasper.l.cruz.mil@army.mil

From Solicitation posted on Jul 08, 2026

Notice history

2
  1. Solicitation Posted Jun 29, 2026
  2. Solicitation LATEST Posted Jul 08, 2026
    • Description: Description was updated

Details

Solicitation number PANMCC-26-P-047957
Notice ID d76ba2e2cdb647a2b594243c5d8b97ca
Notice type Solicitation
Product / Service (PSC) 3695
NAICS 333248
Place of performance Fort Hood, Texas
Archive date Jul 24, 2026

Award Information

Not yet awarded

Contacts

primary
Marvin Hopkins

Email

secondary
CSS, 418th CSB

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
418TH CSB
0418 AQ HQ CONTRACTING SUP

Place of Performance

Fort Hood, Texas 76544
USA

Dates

Posted Jun 29, 2026 1 month ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 09, 2026 4 weeks ago