Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 5 notices

127EAW25R0052 - Upper Golden Trout Bridge Replacement 127EAW25R0052

Solicitation 127EAW25R0052 Copied Notice ID f88ee12e4f7c40ae99b3e016778e10fc Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA SOUTHWEST 6
SAM.gov
Posted
Sep 24, 2025
Deadline
No deadline
Set-aside
NONE
NAICS
237310
PSC
Y1LB

Summary

AI-generated · Aug 24, 2025

Contractor shall remove the existing Upper Golden Trout Bridge, including the bridge span, structures, abutments, and approaches, and replace it with a new bridge per the project plans and specifications. Provide all materials, equipment, supplies, and personnel required to complete the work. Location is Forest Route 22N24, Feather River Ranger District, California. Estimated project magnitude is between $1,000,000 and $5,000,000, and only small businesses that are SAM-certified are eligible to bid.

Compared with the previous notice, the formal solicitation designates a total small-business set-aside and requires proposal documents as specified in Section L.2. Requests for Information must be submitted to the contracting officer using the attached RFI form by the stated deadline. No FS-organized pre-proposal site visit will be held; the project locations are open to the public for viewing, and failure to inspect the site shall not be grounds for a claim after award.

THIS IS A PRE-SOLICITATION NOTICE FOR A REQUEST FOR PROPOSAL (RFP). Proposals shall only be requested and accepted from contractors who are a Small Business AND certified in System for Award Management (SAM, https://sam.gov). The United States Department of Agriculture (USDA), United States Forest Service (USFS), has a requirement for but not limited to the following: 127EAW25R0052 - Upper Golden Trout Bridge Replacement Project Description: The contractor shall furnish all materials, equipment, supplies and personnel necessary to remove and dispose of the existing Upper Golden Trout Bridge including the bridge span and structures, bridge abutments and approaches and replace with a new structure as specified in the project plans and specifications. Project Location: Bridge Coordinates: 39.615992, -121.142517.Forest Route 22N24, Feather River Ranger District, California. Solicitation Number 127EAW25R0052 for this effort will be posted to SAM.gov (https://sam.gov) on or about July 31st, 2025. This solicitation will contain all necessary specifications, drawings and other information necessary submit a proposal for this project. There is currently no official group site visit scheduled. The solicitation will include site visit information if one is deemed necessary. Disclosure of the magnitude of construction projects: The estimated cost of the total project is expected to be between $1,000,000.00 and $5,000,000.00. NAICS Code: 237310 - Highway, Street, and Bridge Construction Size Standard: $45 Million Point of Contact: Gregory Cunningham, Contracting Officer Gregory.Cunningham@USDA.gov Interested firms are encouraged to register via https://sam.gov/ to view the formal solicitation when it is released.

From Presolicitation posted on Jul 16, 2025

127EAW25R0052 - Upper Golden Trout Bridge Replacement Plumas National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 18th, 2025. A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

From Solicitation posted on Jul 29, 2025

127EAW25R0052 - Upper Golden Trout Bridge Replacement - A00001 Plumas National Forest This amendment is to post RFI responses and extend the proposal due date. Proposal due date / time is hereby extended from 09/01/2025 to 09/03/2025, 1:00 PM PST. Attached is "RFI Official Responses - 1" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive. /////////////////////////////////////////////////////////////////////////////////////////////////////// 127EAW25R0052 - Upper Golden Trout Bridge Replacement Plumas National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 18th, 2025. A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

From Solicitation posted on Aug 25, 2025

127EAW25R0052 - Upper Golden Trout Bridge Replacement - A00001 Plumas National Forest This amendment is to post RFI responses and extend the proposal due date. Proposal due date / time is hereby extended from 09/01/2025 to 09/03/2025, 1:00 PM PST. Attached is "RFI Official Responses - 1" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive. /////////////////////////////////////////////////////////////////////////////////////////////////////// 127EAW25R0052 - Upper Golden Trout Bridge Replacement Plumas National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 18th, 2025. A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

From Solicitation posted on Sep 24, 2025

Notice history

5
  1. Presolicitation Posted Jul 16, 2025 View
  2. Solicitation Posted Jul 29, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Not setSep 01, 2025
    • Set-Aside: Total Small Business Set-Aside (FAR 19.5)No Set aside used
  3. Solicitation Posted Aug 25, 2025
    • Description: Description was updated
    • Response Deadline: Sep 01, 2025Sep 03, 2025
  4. Solicitation LATEST Posted Sep 24, 2025
    No changes from previous notice
  5. Award Notice Posted Sep 24, 2025

Details

Solicitation number 127EAW25R0052
Notice ID f88ee12e4f7c40ae99b3e016778e10fc
Award number 127EAW25C0030
Notice type Award Notice
Product / Service (PSC) Y1LB
NAICS 237310
Set-aside No Set aside used
Place of performance Clipper Mills, California
Archive date Oct 09, 2025

Award Information

Awardee
1
Total Awarded
$2,396,444.00
Award Date
Sep 24, 2025

Awardees

Company Name UEI CAGE Code Location
D N B INFRASTRUCTURE, INC. MCTKNNEWNHK7 4VH27 Sacramento, CA

Documents

No files available

View on SAM.gov

Contacts

primary
Greg Cunningham

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA SOUTHWEST 6

Place of Performance

Clipper Mills, California 95930
USA

Dates

Posted Sep 24, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Sep 24, 2025 10 months ago