12445126B0011 NFSR 205 Pavement Reconstruction LOUISIANA 12445126B0011
Summary
AI-generated · Feb 26, 2026Reconstruct pavement on NFSR 205 at Kincaid Recreation Area within Kisatchie National Forest, Rapides Parish, LA. The contractor must supply all materials, labor, tools, equipment, supplies, supervision, and safety measures to remove failed materials, stabilize the base, resurface, compact, and finish the roadway to its original condition.
Award will go to a single lowest-priced responsive/responsible bidder. A bid bond is required. A site visit/pre-bid conference may be held. Proposals must be submitted by email. Work must be completed within 120 days after Notice to Proceed.
Project Title: NFSR 205 Pavement Reconstruction LOUISIANA Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5. NAICS Code: 237310 - Highway, Street, and Bridge Construction (size standard $45m). PSC: Z2LB - Repair Of Highways, Roads, Streets, Bridges, And Railways. Magnitude: Between $2,000,000 and $3,000,000. Location: Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, (Rapides Parish, LA). See Attachment 003 Statement of Work for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. Project includes removal of failed materials, base stabilization, resurfacing, compaction and finishing to restore NFSR 205 Roadway to its original condition. Award of Task Order: A single award will be made to the overall lowest priced responsive/responsible bidder. Tentative Dates: Site(s) Visit/Pre-Bid Conference (if needed): 03/25/2026 - POC Robert Wilson robert.wilson3@usda.gov Date for Questions: 04/20/2026. Bid Submittal Deadline: 04/30/2026, 1300 CT. - NOTE: Bid Bond is required Delivery: 120 Days After Notice to Proceed Period of Performance: 120 Days After Notice to Proceed Submittal Method: All proposals will be emailed to adam.doyle@usda.gov and cc steven.alves@usda.gov You may email to confirm receipt.
From Combined Synopsis/Solicitation posted on Feb 25, 2026Project Title: NFSR 205 Pavement Reconstruction LOUISIANA Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5. NAICS Code: 237310 - Highway, Street, and Bridge Construction (size standard $45m). PSC: Z2LB - Repair Of Highways, Roads, Streets, Bridges, And Railways. Magnitude: Between $2,000,000 and $3,000,000. Location: Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, (Rapides Parish, LA). See Attachment 003 Statement of Work for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. Project includes removal of failed materials, base stabilization, resurfacing, compaction and finishing to restore NFSR 205 Roadway to its original condition. Award of Task Order: A single award will be made to the overall lowest priced responsive/responsible bidder. Tentative Dates: Site(s) Visit/Pre-Bid Conference (if needed): 03/25/2026 - POC Robert Wilson robert.wilson3@usda.gov Date for Questions: 04/20/2026. Bid Submittal Deadline: 04/30/2026, 1300 CT. - NOTE: Bid Bond is required Delivery: 120 Days After Notice to Proceed Period of Performance: 120 Days After Notice to Proceed Submittal Method: All proposals will be emailed to adam.doyle@usda.gov and cc steven.alves@usda.gov You may email to confirm receipt.
From Combined Synopsis/Solicitation posted on Mar 04, 2026Project Title: NFSR 205 Pavement Reconstruction LOUISIANA Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5. NAICS Code: 237310 - Highway, Street, and Bridge Construction (size standard $45m). PSC: Z2LB - Repair Of Highways, Roads, Streets, Bridges, And Railways. Magnitude: Between $2,000,000 and $3,000,000. Location: Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, (Rapides Parish, LA). See Attachment 003 Statement of Work for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. Project includes removal of failed materials, base stabilization, resurfacing, compaction and finishing to restore NFSR 205 Roadway to its original condition. Award of Task Order: A single award will be made to the overall lowest priced responsive/responsible bidder. Tentative Dates: Site(s) Visit/Pre-Bid Conference (if needed): 03/25/2026 - POC Robert Wilson robert.wilson3@usda.gov Date for Questions: 04/20/2026. Bid Submittal Deadline: 04/30/2026, 1300 CT. - NOTE: Bid Bond is required Delivery: 120 Days After Notice to Proceed Period of Performance: 120 Days After Notice to Proceed Submittal Method: All proposals will be emailed to adam.doyle@usda.gov and cc steven.alves@usda.gov You may email to confirm receipt.
From Combined Synopsis/Solicitation posted on Mar 09, 2026Amendment 003 Site Visit Details for 03/25/2026, 0930CT, 799H+RJ, Alexandria, LA 71409, POC Robert Wilson robert.wilson3@usda.gov / 318-452-1442; RSVP Requested! Amendment 002 Questions and Answers - Specifications Clarification Amendment 001 Updated to Pay Items /Reposting of Legible Plans Project Title: NFSR 205 Pavement Reconstruction LOUISIANA Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5. NAICS Code: 237310 - Highway, Street, and Bridge Construction (size standard $45m). PSC: Z2LB - Repair Of Highways, Roads, Streets, Bridges, And Railways. Magnitude: Between $2,000,000 and $3,000,000. Location: Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, (Rapides Parish, LA). See Attachment 003 Statement of Work for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. Project includes removal of failed materials, base stabilization, resurfacing, compaction and finishing to restore NFSR 205 Roadway to its original condition. Award of Task Order: A single award will be made to the overall lowest priced responsive/responsible bidder. Tentative Dates: Site(s) Visit/Pre-Bid Conference (if needed): 03/25/2026 - POC Robert Wilson robert.wilson3@usda.gov Date for Questions: 04/20/2026. Bid Submittal Deadline: 04/30/2026, 1300 CT. - NOTE: Bid Bond is required Delivery: 120 Days After Notice to Proceed Period of Performance: 120 Days After Notice to Proceed Submittal Method: All proposals will be emailed to adam.doyle@usda.gov and cc steven.alves@usda.gov You may email to confirm receipt.
From Combined Synopsis/Solicitation posted on Mar 19, 2026Amendment 003 Site Visit Details for 03/25/2026, 0930CT, 799H+RJ, Alexandria, LA 71409, POC Robert Wilson robert.wilson3@usda.gov / 318-452-1442; RSVP Requested! Amendment 002 Questions and Answers - Specifications Clarification Amendment 001 Updated to Pay Items /Reposting of Legible Plans Project Title: NFSR 205 Pavement Reconstruction LOUISIANA Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5. NAICS Code: 237310 - Highway, Street, and Bridge Construction (size standard $45m). PSC: Z2LB - Repair Of Highways, Roads, Streets, Bridges, And Railways. Magnitude: Between $2,000,000 and $3,000,000. Location: Kincaid Recreation Area, Calcasieu Ranger District, Kisatchie National Forest, (Rapides Parish, LA). See Attachment 003 Statement of Work for specific location. Scope of Work (summarized): See Attachment 003 Statement of Work for specific details not included under this paragraph. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals, supervision, and safety measures necessary to complete this project. Project includes removal of failed materials, base stabilization, resurfacing, compaction and finishing to restore NFSR 205 Roadway to its original condition. Award of Task Order: A single award will be made to the overall lowest priced responsive/responsible bidder. Tentative Dates: Site(s) Visit/Pre-Bid Conference (if needed): 03/25/2026 - POC Robert Wilson robert.wilson3@usda.gov Date for Questions: 04/20/2026. Bid Submittal Deadline: 04/30/2026, 1300 CT. - NOTE: Bid Bond is required Delivery: 120 Days After Notice to Proceed Period of Performance: 120 Days After Notice to Proceed Submittal Method: All proposals will be emailed to adam.doyle@usda.gov and cc steven.alves@usda.gov You may email to confirm receipt.
From Combined Synopsis/Solicitation posted on Apr 10, 2026Notice history
5-
-
Combined Synopsis/Solicitation Posted Mar 04, 2026No changes from previous notice
-
Combined Synopsis/Solicitation Posted Mar 09, 2026No changes from previous notice
-
Combined Synopsis/Solicitation Posted Mar 19, 2026View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation LATEST Posted Apr 10, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA