11 SFS ECP Equipment BPA FA706025Q0016
Summary
AI-generated · Aug 24, 2025Entry Control Point equipment is required to support contingency JTF-NCR response operations across the Armed Forces District of Washington. The requested items cover traffic-control and security barriers, including ready spike strips, speed bumps, portable retractable belts/barriers, cones, concertina wire, lightweight work-gate barriers, heavy-duty bollards, and traffic stanchions.
Combined Synopsis/Solicitation for a network-less Remote Generator Monitoring System to monitor 11 CES emergency generators. The system must be fully self-contained, store all data locally, and allow retrieval to a laptop via cable with Microsoft Excel-compatible analysis—no Internet/cloud connectivity and no ongoing data-storage subscriptions. It should log every generator operation with exact date, time, duration, and reason; provide inputs and outputs (discrete/analog inputs, control relays, serial port), alert mechanisms, and an LCD display. Installation target is 11 WG emergency generators. Amendments: A0001 adds the explicit logging requirement to each operation; A0002 cancels the site visit due to no responses.
The 11th SFS has a requirement for Entry Control Point (ECP) equipment to support contingency JTF-NCR response operations across the Armed Forces District of Washington (AFDW). The equipment will consist of ready spike strips, various speed bumps, portable retractable belts/barriers, cones, concertina wire, light weight work-gate barriers, heavy duty bollards, and traffic stanchions.
From Solicitation posted on Jul 16, 2025The Remote Generator Monitoring System is a new requirement designed to provide comprehensive monitoring of generator performance, including run-time hours, without requiring Internet connectivity with a required delivery date of 90 days ADC. The system is fully self-contained and operates independently, ensuring data security and accessibility even in remote locations. Data is stored locally, and a customized procedure is included to allow easy retrieval of information directly to a laptop via Microsoft Excel for analysis and reporting, without the need for specialized or proprietary software. This eliminates the complexities and potential vulnerabilities associated with cloud-based solutions. The critical performance for this requirement will be the following; Provide an assessment as to whether the requirements are military unique or can be acquired to some degree in the commercial market sector. Identify as appropriate any critical and long lead schedule items which will impact contract performance and delivery requirements. Ability to store logged data locally and download data by connecting to laptop via cable (i.e. no cellular/internet network connection, no ethernet cables) - Data is stored locally, and a customized procedure is included to allow easy retrieval of information directly to a laptop via Microsoft Excel for analysis and reporting, without the need for specialized or proprietary software - No annual subscription/renewal fees for data storage or cellular connectivity - Discrete alarm inputs - Analog inputs - Control relays - Serial port - Alert speakers and LCD display ****Amendment A0001 - This solicitation has been amended, the purpose of this amendment is to add the following information to the description section. The automatic monitoring devices are required to log the exact date, time, duration, and reason for every single operation of the generator. The generators themselves do not automatically log this information, and 11 CES does not have the manpower needed to monitor every single generator's operational status 24/7. Therefore, each unexpected operation of an emergency generator (i.e. unexpected utility outage) constitutes a permit violation. JBAB's current inability to collect this information triggers Title V permit violations, which can each result in fines. The automatic monitoring devices, once installed, will log this information automatically which can then be downloaded by 11 CES Power Pro at any time. This will allow JBAB to return to compliance on violated permit conditions. This requirement is for network-less devices (i.e. all data collected is stored locally). For ease of installation, use, and maintenance of the devices, on 11 WG emergency generators. The requirement does not allow for connectivity to cellular/internet networks or storage of sensitive information on the device manufacturer's cloud and is for network-less devices on all generators. ****Amendment A0002 - This solicitation has been amended, The purpose of this amendment is to cancel the site visit due to no responses being received by the specified date and time in Attachment 8 - Site Visit Instructions.
From Combined Synopsis/Solicitation posted on Aug 14, 2025The Remote Generator Monitoring System is a new requirement designed to provide comprehensive monitoring of generator performance, including run-time hours, without requiring Internet connectivity with a required delivery date of 90 days ADC. The system is fully self-contained and operates independently, ensuring data security and accessibility even in remote locations. Data is stored locally, and a customized procedure is included to allow easy retrieval of information directly to a laptop via Microsoft Excel for analysis and reporting, without the need for specialized or proprietary software. This eliminates the complexities and potential vulnerabilities associated with cloud-based solutions. The critical performance for this requirement will be the following; Provide an assessment as to whether the requirements are military unique or can be acquired to some degree in the commercial market sector. Identify as appropriate any critical and long lead schedule items which will impact contract performance and delivery requirements. Ability to store logged data locally and download data by connecting to laptop via cable (i.e. no cellular/internet network connection, no ethernet cables) - Data is stored locally, and a customized procedure is included to allow easy retrieval of information directly to a laptop via Microsoft Excel for analysis and reporting, without the need for specialized or proprietary software - No annual subscription/renewal fees for data storage or cellular connectivity - Discrete alarm inputs - Analog inputs - Control relays - Serial port - Alert speakers and LCD display ****Amendment A0001 - This solicitation has been amended, the purpose of this amendment is to add the following information to the description section. The automatic monitoring devices are required to log the exact date, time, duration, and reason for every single operation of the generator. The generators themselves do not automatically log this information, and 11 CES does not have the manpower needed to monitor every single generator's operational status 24/7. Therefore, each unexpected operation of an emergency generator (i.e. unexpected utility outage) constitutes a permit violation. JBAB's current inability to collect this information triggers Title V permit violations, which can each result in fines. The automatic monitoring devices, once installed, will log this information automatically which can then be downloaded by 11 CES Power Pro at any time. This will allow JBAB to return to compliance on violated permit conditions. This requirement is for network-less devices (i.e. all data collected is stored locally). For ease of installation, use, and maintenance of the devices, on 11 WG emergency generators. The requirement does not allow for connectivity to cellular/internet networks or storage of sensitive information on the device manufacturer's cloud and is for network-less devices on all generators. ****Amendment A0002 - This solicitation has been amended, The purpose of this amendment is to cancel the site visit due to no responses being received by the specified date and time in Attachment 8 - Site Visit Instructions. ****Amendment A0003 - This solicitation has been amended, The purpose of this amendment is to update the attachment section of the solicitation by adding Attachment 10 Generator Information which provides additional details of the generators the Monitoring Devices will be installed on and to extend the solicitation closing date to Friday, August 29, 2025 at 4:00pm EDT.
From Combined Synopsis/Solicitation posted on Aug 25, 2025Notice history
3-
Solicitation Posted Jul 16, 2025
-
Combined Synopsis/Solicitation Posted Aug 14, 2025View changes (5)
- Title: 11 SFS ECP Equipment BPA → PKA - 11 CES Automatic Generator Monitoring Devices
- Description: Description was updated
- Notice Type: Solicitation → Combined Synopsis/Solicitation
- Response Deadline: Jul 29, 2025 → Aug 26, 2025
- NAICS Codes: 238990 → 334513
-
Combined Synopsis/Solicitation LATEST Posted Aug 25, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 26, 2025 → Aug 29, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA