General information for Charter Contracting Company, LLC
Physical address
500 Harrison Ave Ste 4r, Boston, Ma, 02118
Mailing address
500 Harrison Ave Ste 4r, Boston, MA, 02118
Website
charter.us
Points of contact for Charter Contracting Company, LLC
SAM.gov Points of Contact
Lisa
Arseneault
Government Business POC
Electronic Business POC
Pre-construction Manager
500 Harrison Avenue, Suite 4R, Boston, MA, 02118
Theresa
Maloof
Alternate Government Business POC
Alternate Electronic Business POC
Director, Accounting and IT
500 Harrison Avenue, Suite 4R, Boston, MA, 02118
Additional contact details may be available
NAICS codes for Charter Contracting Company, LLC
| Code | Description | Small Business |
|---|---|---|
|
562910
PRIMARY
|
Remediation Services
|
No
|
| 237110 | Water and Sewer Line and Related Structures Construction | No |
| 237130 | Power and Communication Line and Related Structures Construction | No |
| 237310 | Highway, Street, and Bridge Construction | No |
|
237990
|
Other Heavy and Civil Engineering Construction
|
No
|
|
238910
|
Site Preparation Contractors
|
No
|
|
238990
|
All Other Specialty Trade Contractors
|
No
|
|
484220
|
Specialized Freight (except Used Goods) Trucking, Local
|
No
|
|
484230
|
Specialized Freight (except Used Goods) Trucking, Long-Distance
|
No
|
|
562119
|
Other Waste Collection
|
No
|
|
562212
|
Solid Waste Landfill
|
No
|
|
562219
|
Other Nonhazardous Waste Treatment and Disposal
|
No
|
PSC codes for Charter Contracting Company, LLC
| Code | Description |
|---|---|
| F100 | ENVIRONMENTAL SYSTEMS PROTECTION |
| F108 | ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION |
| F112 | ENVIRONMENTAL SYSTEMS PROTECTION- OIL SPILL RESPONSE |
|
F999
|
OTHER ENVIRONMENTAL SERVICES
|
|
M1KF
|
OPERATION OF DREDGING FACILITIES
|
|
N038
|
INSTALLATION OF EQUIPMENT- CONSTRUCTION, MINING, EXCAVATING, AND HIGHWAY MAINTENANCE EQUIPMENT
|
|
P400
|
SALVAGE- DEMOLITION OF BUILDINGS
|
|
P500
|
SALVAGE- DEMOLITION OF STRUCTURES/FACILITIES (OTHER THAN BUILDINGS)
|
|
Y100
|
CONSTRUCTION OF STRUCTURES AND FACILITIES
|
|
Y1KA
|
CONSTRUCTION OF DAMS
|
|
Y1KD
|
CONSTRUCTION OF MINE SUBSIDENCE CONTROL FACILITIES
|
|
Y1KE
|
CONSTRUCTION OF SURFACE MINE RECLAMATION FACILITIES
|
|
Y1KF
|
CONSTRUCTION OF DREDGING FACILITIES
|
|
Y1KZ
|
CONSTRUCTION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
|
|
Y1LB
|
CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
|
|
Y1LC
|
CONSTRUCTION OF TUNNELS AND SUBSURFACE STRUCTURES
|
|
Y1MC
|
CONSTRUCTION OF EPG FACILITIES - GEOTHERMAL
|
|
Y1MD
|
CONSTRUCTION OF EPG FACILITIES - HYDRO
|
|
Y1MG
|
CONSTRUCTION OF EPG FACILITIES - SOLAR
|
|
Y1MH
|
CONSTRUCTION OF EPG FACILITIES - WIND
|
|
Y1MZ
|
CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION
|
|
Y1NC
|
CONSTRUCTION OF POLLUTION ABATEMENT AND CONTROL FACILITIES
|
|
Y1ND
|
CONSTRUCTION OF SEWAGE AND WASTE FACILITIES
|
|
Y1NZ
|
CONSTRUCTION OF OTHER UTILITIES
|
|
Y1PA
|
CONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING)
|
|
Y1PC
|
CONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND)
|
|
Y1PD
|
CONSTRUCTION OF WASTE TREATMENT AND STORAGE FACILITIES
|
|
Y1PZ
|
CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
|
|
Y1QA
|
CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
|
|
Z1KF
|
MAINTENANCE OF DREDGING FACILITIES
|
|
Z2KA
|
REPAIR OR ALTERATION OF DAMS
|
|
Z2KF
|
REPAIR OR ALTERATION OF DREDGING FACILITIES
|
|
Z2KZ
|
REPAIR OR ALTERATION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
|
|
Z2LC
|
REPAIR OR ALTERATION OF TUNNELS AND SUBSURFACE STRUCTURES
|
|
Z2ND
|
REPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES
|
|
Z2NZ
|
REPAIR OR ALTERATION OF OTHER UTILITIES
|
|
Z2PD
|
REPAIR OR ALTERATION OF WASTE TREATMENT AND STORAGE FACILITIES
|
|
Z2PZ
|
REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILITIES
|
|
Z2QA
|
REPAIR OR ALTERATION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
|